  • CASE STUDIES
    OUR APPLICATION CASE STUDIES ASSIT IN DETERMINING OPTIMAL SOLUTIONS FOR OUR CUSTOMERS. TOGETHER WITH OUR PARTNERS WE DRAW ON LOCAL AND WORLDWIDE EXPERIENCE AND INDUSTRY APPLICATIONS.
    CONTACT

Iron Ore Port Facility High Tension Bend Pulley

In November 2017 a major iron ore port facility in the Pilbara decided to replace the ceramic lagging on a high tension bend pulley – the ceramic lagging had suffered physical damage on one edge that had exposed the pulley shell. With a capacity of around 180 million tonnes/ annum of iron ore the port operates 24/7 year round and so reliability of the conveyor system is critical to achieving the maximum ore through put.

LEARN MORE

Iron Ore Port Facility High Tension Bend Pulley

In November 2017 a major iron ore port facility in the Pilbara decided to replace the ceramic lagging on a high tension bend pulley – the ceramic lagging had suffered physical damage on one edge that had exposed the pulley shell. With a capacity of around 180 million tonnes/ annum of iron ore the port operates 24/7 year round and so reliability of the conveyor system is critical to achieving the maximum ore through put.

LEARN MORE

Iron Ore Port Facility High Tension Bend Pulley

In November 2017 a major iron ore port facility in the Pilbara decided to replace the ceramic lagging on a high tension bend pulley – the ceramic lagging had suffered physical damage on one edge that had exposed the pulley shell. With a capacity of around 180 million tonnes/ annum of iron ore the port operates 24/7 year round and so reliability of the conveyor system is critical to achieving the maximum ore through put.

LEARN MORE

Vale’s Vargem Grande Iron Ore Conveyor Lagging Problem

Vale-operated Vargem Grande mine site is located in the state of Minas Gerais, Brazil and contains 2.53 billion tonnes of proven and probable iron ore reserves, making it the world’s fourth biggest iron ore mining operation. The Vargem Grande site comprises three open-pits: Tamandua, Capitao do Mato and Aboboras. The Vargem Grande site maintenance personel wanted to increase the service life of the lagging on a number of non-drive pulleys installed on a belt turn over conveyor.

LEARN MORE

Vale’s Vargem Grande Iron Ore Conveyor Lagging Problem

Vale-operated Vargem Grande mine site is located in the state of Minas Gerais, Brazil and contains 2.53 billion tonnes of proven and probable iron ore reserves, making it the world’s fourth biggest iron ore mining operation. The Vargem Grande site comprises three open-pits: Tamandua, Capitao do Mato and Aboboras. The Vargem Grande site maintenance personel wanted to increase the service life of the lagging on a number of non-drive pulleys installed on a belt turn over conveyor.

LEARN MORE

Vale’s Vargem Grande Iron Ore Conveyor Lagging Problem

Vale-operated Vargem Grande mine site is located in the state of Minas Gerais, Brazil and contains 2.53 billion tonnes of proven and probable iron ore reserves, making it the world’s fourth biggest iron ore mining operation. The Vargem Grande site comprises three open-pits: Tamandua, Capitao do Mato and Aboboras. The Vargem Grande site maintenance personel wanted to increase the service life of the lagging on a number of non-drive pulleys installed on a belt turn over conveyor.

LEARN MORE
ENQUIRE NOW
ENQUIRE NOW
CONTACT US
DOWNLOADS
CASE STUDIES
PRIVACY POLICY
CONTACT US
DOWNLOADS
CASE STUDIES
PRIVACY POLICY
CONTACT US
DOWNLOADS
CASE STUDIES
PRIVACY POLICY

Copyright 2021 | ROKEBY TECHNOLOGIES PTY LTD | All Rights Reserved
  • Home
  • About
  • Engineered Solutions
  • Products
    • Pulley Lagging Systems
    • Wear Panel Systems
    • Surface Protection Systems
  • Contact
Rokeby Technologies